Project

Catalina Island and Big Creek Hydroelectric Complex

SCE dam #5 reservoir along Big Creek in the foreground and 220 kV switch rack yard for SCE Powerhouse 2 / 2A in the background – looking west.

CLIENT
SCE
services
Project / Construction Management
ABOUT THIS PROJECT

This project is part of the Strategy Division for Catalina Island and the Big Creek hydroelectric complex (972 MW total power generation capacity). The Big Creek hydroelectric complex consists of Portal Powerhouse (PH) (10 MW), PH 1 (82 MW), Eastwood PH (200 MW + energy storage), PH 2 (67 MW), PH 2A (98 MW), PH 8 (64 MW), Mammoth PH (187 MW), PH 3 (64 MW) and PH 4 (200 MW). This project supports Southern California Edison’s (SCE) energy strategy by coordinating and aligning multiple energy (power generation / energy storage) and infrastructure projects (dams / reservoirs / grid rakes / large diameter water valves / pipelines / penstocks / desalination / transmission and distribution) into a unified program.

 

COMMUNITY BENEFITS

The project supports sustainable energy initiatives and strengthens energy infrastructure for Catalina Island and surrounding communities.

 

Mentorship / Internship Opportunities
Related Projects
Shirk Battery Energy Storage System
Shirk Battery Energy Storage System

Terravanta is currently overseeing an 80MW Battery Energy Storage System (BESS) located in Visalia area and is actively managing design, engineering, procurement, construction, and commissioning phases.

read more
McFadden Battery Energy Storage System
McFadden Battery Energy Storage System

Terravanta is currently overseeing an 50MW Battery Energy Storage System (BESS) located in Orange County area and are actively managing engineering design for substation, transmission, and telecom activities.