California High Speed Rail – CP2-CP3 Transmission Distribution Relocation

CLIENT
Stantec
services
Engineering
ABOUT THIS PROJECT

This project will focus on the transmission and distribution of electrical infrastructure along the CP2/CP3 route. This includes the installation of new transmission lines and substations, as well as the relocation of existing utility locations to ensure a reliable power supply for the high-speed rail system. By utilizing Bentley OpenRoads drafting software, we’re able to capture and convey profile data about the impacted areas, including all future required construction for both new and existing utility owners. This ensures that the electrical infrastructure is seamlessly integrated with the rail system, providing a sustainable and efficient energy solution.

 

COMMUNITY BENEFITS

Numerous communities will benefit from a faster, more environmentally sustainable, and reliable form of public transportation while saving time and carbon emissions. This new rail that runs all throughout California will allow for a more efficient means to explore, learn, and create new communities.

Related Projects