Project

City of Simi Valley Transit

CLIENT
Simi Valley Transit
services
Project / Construction Management
ABOUT THIS PROJECT
Terravanta is currently providing utility coordination services for the City of Simi Valley Transit’s Battery Electric Bus Charging Infrastructure project, serving as the primary liaison with Southern California Edison (SCE). Leveraging our expertise in transportation electrification, Terravanta acts as a trusted advisor to both the City and SCE, ensuring project requirements are effectively integrated into design and construction efforts while maintaining compliance with all applicable Charge Ready Program requirements.

 

COMMUNITY BENEFITS

This project delivers many benefits to the overall community. Here are some examples of the community benefits provided:

  • Cleaner, Healthier Community: Reduces greenhouse gas emissions, improves local air quality, and supports the City’s transition to a zero-emission transit fleet.
  • Enhanced Transit Service: Expands electric bus operations and improves service reliability through strategically located charging infrastructure.
  • Quieter Streets and Neighborhoods: Replaces traditional diesel vehicles with quieter battery-electric buses, reducing noise impacts along transit routes.
  • Sustainable Infrastructure Investment: Integrates clean energy solutions and supports long-term environmental stewardship and regulatory compliance.
  • Future-Ready Transportation Network: Positions Simi Valley Transit to meet growing mobility needs with efficient, resilient, and sustainable transit infrastructure.

 

Related Projects
Los Angeles Metro Airport Connector (AMC)
Los Angeles Metro Airport Connector (AMC)

This project involves commissioning key building systems—such as mechanical, electrical, plumbing, and safety—to ensure they are properly designed, installed, and functioning. It focuses on verifying that all systems meet the Owner’s Project Requirements (OPR).

read more
LA Metro – Transport Sub Division 9
LA Metro – Transport Sub Division 9

Terravanta is supporting with project /construction management services to Southern California Edison for the design, procurement, construction and close-out of a new substation, added facilities substation for LA Metro.

read more